Books (Pages)

First, select the type of book.

 

 

Folded Booklets:

 

 

 

Flat Booklets:

 

 

 

 

Buttons:

 

When this button says "Pages", the fields present represent the pages of the book.  When you click this button it changes to "Cover" and the fields represent the cover of the book.

 

After the job form is completed, click the SAVE button to save the job to a new quote, work order or invoice or an existing quote, work order or invoice. The first action to occur when you click the SAVE button is a recalculation of the prices.

 

After you have saved the job to a quote, work order or invoice, you can click the VIEW button for a thumbnail quick view of all the jobs that are on the order.

 

During the entry of job requirements or after you have completed entering the job requirements, click the ReCALC button to initiate calculations of the total price.

 

The Green Lock Button

A lock button is used to lock a value into a calculated field. If you would like to over rule a calculated value in a field (any price field or over run), simply enter the value you want and press the lock button. The button will turn red when it is locked. When the job is recalled the value will still be locked and the button will still be red.

 

The Yellow Hows It Button

A Hows It button will show you how a value is calculated. For example, if you press the Hows It button beside the Stock Price field you will see an explanation of the value in the stock price. You will see the price per thousand of the chosen stock, times the quantity, times the quantity factor, times a color factor.

 

(For an explanation of these terms read the "Stock Price" field definition)

 

The Orange Pricing Tables Expose Button

Clicking the large orange button will change it to say On and will cause small orange buttons to appear on the form. The small buttons are your direct entry into the pricing tables. The small orange button will call the pricing table or form related to the field it is close to.

 

Fields:

 

Description

The description placed here will be the description shown on the quote, work order and invoice. The description can be longer than the line shown on the job sheet. If the description is longer than the line it will wrap as many times as necessary to fit onto the quote, work order or invoice. It is the line searched when using the search engine to find archived jobs. However, it should be concise and if possible it should fit on this line.

 

It can contain names and quantities if necessary, although the quantity fields also appear on the printed orders and reports.

 

Books

The number of books the customer will carry away when the job is done.

 

Inside Pages

The number of pages inside the book.  For flat booklets, the number must be a multiple of 2.  For folded booklets, the number must be a multiple of 4.

 

Back Side Press Factor

Factor defining how much longer it takes the press to run on the back side of a given job.

 

Press Difficulty Factor

Factor defining how much longer it takes the press to run a given job.

 

Press Rates

The drop down "Press Rates" refers to the rates defined for the presses used in your business. A press can have more than one set of rates but that would be unusual. If you use three presses in your business they would each have their own set of rates. The name of the press is usually the name appearing in the drop down list. Each selection is associated with a set of press setup tables.

 

Finished Size

This is the size of the sheet the customer wants when the job is complete.

 

Stock Size

This is the size of the paper used on the press. It can be later cut into smaller pieces or trimmed to produce the finished size.

 

Up

This refers to the number of finished size pieces that will be printed on one stock size sheet.

 

Cut

This is the number of cuts necessary to convert the stock size to the finished size.

 

Fold

The number folds is calculated for folded booklets only, and there is always only one fold per booklet.

 

Omit Start Over Run

Checking this field will cause the calculations to omit the start over run

 

Work and Turn/Tumble

Check this option if using a work and turn/work and tumble process to print front and back without having to change the plates.

 

Sheets

The number of stock size sheets necessary to produce the originals times the copies given the number of finished size up on the stock size. If the customer wants 2000 copies of 10 originals which are 8.5"x11", and the stock being used on the press is 8.5"x11"; the number up would be 1 (one piece of stock yields one finished sheet); the number of cuts would be 0; the number of sheets would be (2000 x 10 =) 20,000. If the finished size in the above example was 5.5"x8.5", there would be 2 up (one piece of stock yields two finished sheets) and 1 cut and the number of sheets would be 10,000.

 

Over Run

This is the number of sheets that will be wasted in the press setup and during the press run. This number also includes any sheets wasted in a pre-press or a bindery operation. Over Run Hows It button

 

Total Run

This is the total of the two fields, "Sheets" and "Over Run". This is the number of sheets you will need to start in order to produce the number of copies of originals.

 

Run Size

The actual size that runs through the press, not necessarily the finished size.

 

Stock Sheets

The number of sheets of stock that will be required for the job.

 

Stock Price

The stock price is calculated using the price per thousand (customers price), times the value in the total field, times the quantity factor, times the color factor.

 

Stock Type

The stock type drop down list comes from the types of stock you have defined in the stock tables. They can be text weight, cover weight, index, NCR, bond etc. To add a type to the list, go to stock tables, then select the Sheets Form.  The paper you use is divided into the stock types. There is a Special selection in stock type that will allow you to define the stock you will be using if it is not one of your standard stocks. Special Paper

 

The default stock type can be changed in the System Options of the PSM Setup Table.

 

Stock Name

The type chosen in the stock type drop down list, will determine the choices that you have in the stock name drop down list. Several factors elsewhere are affected by the selection of the stock name here. Defined in the stock tables are the relationships between the press and the bindery equipment and this stock in its various sizes.

 

Stock Color

The stock color comes from the stock tables. If you have defined one color there and manually put in another color in the stock color field, the color factor will come into affect when the price for the stock is calculated. For example, if the default for 20# Bond is White, and you enter Robins Egg Blue into the color field, the color factor will be multiplied times the price to give the final price. However, if the color factor is 0.00 the program will refuse to accept any color other than the defined color.

 

Press Price

Press Price displays the price calculated for running the press. This is based on the press setup tables and the relationships existing between the press, stock and stock size.

 

and

By clicking on the buttons or the words the ink selection form is opened. If you click on the front ink icon the form defaults to selections for the front of the stock. If you click on the back ink icon the form defaults to selections for the back of the stock. On the ink selection form you can choose to select ink for front or back or both. The charges indicated in the ink list boxes are for ink setup, which includes clean up. To remove a selection, double click on it in the selection in the ink list box.

 

Ink Price

The value in ink price is the total of all the ink setup charges.

 

By clicking on the bindery button or the words the bindery selection form is opened. To remove a selection, double click on it in the

selection in the bindery list box.

 

Bindery Price

The total bindery price is calculated when the ReCALC button is pressed

 

By clicking the pre-press button or the words the pre-press selection form is opened. To remove a selection, double click on it in the selection in the pre-press list box.

 

Pre Press Price

The total pre-press price is calculated when the ReCALC button is pressed

 

Note : If you right click on an ink, bindery, or pre-press window, a box will show all options selected if they are not all visible.

 

Notes

The notes field will hold several pages of special instructions or notes. Simply start typing to enter notes. The field will automatically wrap sentences or you can hit Enter to change lines.

The program will insert automatically notes about special stock selections into the notes field.

 

Salesman

Select the name of the person entering the job from the drop down list. The Salesman table is available for adding or removing sales people, under the Maintenance menu selection, under Table Browser.

 

Set Priority

Use this field to set the priority of the job: 1 being lowest and 8 being highest priority

 

Price Adjustment

The total of the items on the job can be adjusted up or down by entering a value into this field. For example if the customers job is going to be easier over all than the systems indicated price, you can enter a negative number in the price adjustment field to lower the total price by the percent entered. Or if the job, for some reason, will be more difficult than the description you can enter a positive number to increase the price of the job. The price adjustment does show on the quote in detail view.

 

Pages Total

The total price for the inside pages.

 

Cover Total

The total price for the cover.

 

Total Book

The total price for the job, pages total plus cover total. This field is changed to 0.00 every time something is change on the form. It is recalculated when the ReCALC button is clicked.